top of page

The Trade-off in Seismic Periods

  • Writer: Adisorn O.
    Adisorn O.
  • 6 days ago
  • 1 min read

Short-period buildings (Low rises) are typically subjected to higher base shear but smaller displacement and very low risk of the P-Delta effect.


Long-period buildings (Tall buildings) are usually subjected to lower seismic loads, but that can cause larger displacement and P-Delta forces


However, for buildings in the Bangkok area, the design ground acceleration is quite constant up to the period of 2 s. So tall buildings might also be subject to high seismic force and large displacement.



bottom of page