top of page

Is it allowed to use concrete pile without dowel bars in SDC C?

No. According to ACI 318-14 (ASCE 7-10), we need to extend at least pc strand from concrete pile into pilecap. For using pc strand the fixity of pile to pilecap is limited and shall not be counted.



ree

ree

Reference: CRSI, Design Guide for Pile Caps, 1st ed. (2015)

bottom of page